These results are based on a high-level technical analysis at this early stage and are subject to change as more information becomes available.
![]() Fully meets goal |
![]() Mostly meets goal |
![]() Partially meets goal |
![]() Limited meets goal |
| Goals | Alternative 1: Proposed Sherwood West Concept Plan Realignment | Alternative 2: Existing Alignment with Signalized Elwert/Edy Intersection | Alternative 3: Existing Alignment with Dual Roundabout |
|---|---|---|---|
| Safety and Livability: Enhance safety and operational performance for all users consistent with future urban conditions. | ![]() |
![]() |
![]() |
| Mobility and Function: Create a roadway connection that maintains mobility, connectivity, supports Sherwood West’s planned future development, and balances regional mobility with local access and aesthetics. | ![]() |
![]() |
![]() |
| Land Use and Environment: Protect sensitive natural systems such as Chicken Creek and its greenway corridor and considers private property and utility impact* | ![]() |
![]() |
![]() |
| Feasibility: Identify a preferred alignment that is practical, cost-effective, constructible, and maintainable over the long term. | ![]() |
![]() |
![]() |
| Cost |
$$$$ |
$$$ |
$$$$ |
* Each alternative can be designed to minimize environmental impacts while potentially improving healthy stream and habitat conditions. Evaluation is limited to private property impacts.