Skip to main content

Comparison of Alternatives

These results are based on a high-level technical analysis at this early stage and are subject to change as more information becomes available.

fully meets goal
Fully meets goal
three-quarters meets goal
Mostly meets goal
half meets goal
Partially meets goal
one-quarter meets goal
Limited meets goal

 

Goals Alternative 1: Proposed Sherwood  West Concept Plan Realignment Alternative 2: Existing Alignment with Signalized Elwert/Edy Intersection Alternative 3: Existing Alignment with Dual Roundabout
Safety and Livability: Enhance safety and operational performance for all users consistent with future urban conditions.​ fully meets goal three-quarters meets goal three-quarters meets goal
Mobility and Function: Create a roadway connection that maintains mobility, connectivity, supports Sherwood West’s planned future development, and balances regional mobility with local access and aesthetics.​ three-quarters meets goal three-quarters meets goal three-quarters meets goal
Land Use and Environment: Protect sensitive natural systems such as Chicken Creek and its greenway corridor and considers private property and utility impact* half meets goal fully meets goal three-quarters meets goal
Feasibility: Identify a preferred alignment that is practical, cost-effective, constructible, and maintainable over the long term.​ half meets goal three-quarters meets goal half meets goal
Cost

$$$$

$$$

$$$$

* Each alternative can be designed to minimize environmental impacts while potentially improving healthy stream and habitat conditions. Evaluation is limited to private property impacts.